Contractor Deposit Laws by State: How Much You Can Legally Ask For Up Front

By . Updated November 24, 2026. 20 min read.

Short answer

No federal law caps contractor deposits. A few states cap them on residential work: California and Nevada at $1,000 or 10% of the price, whichever is less, and Maryland, Massachusetts, Pennsylvania (over $5,000) and Maine (over $3,000) at about one-third. Others, like Florida, New York and Texas, set no cap but use permit deadlines, escrow or trust rules.

On this page
  1. What deposit is typical, and what drives it
  2. Contractor deposit laws by state, as of November 2026
  3. Who the caps cover, and the exceptions
  4. States with no cap: escrow, trust and permit rules
  5. Deposit vs down payment vs progress payment
  6. Can a contractor ask for 50% up front?
  7. Setting your own deposit policy: a worked example
  8. Refunds, cancellation and the FTC 3-day rule
  9. Putting the deposit on the estimate: wording
  10. FAQ

There's no single contractor deposit law in the US: there's no federal cap, and the states that set one pick very different numbers. On the same $14,500 deck job, California lets you take $1,000 at signing, Maryland a third, and Texas sets no limit but treats the money as held in trust for the job. This guide gives you a state-by-state table built from the statutes and contractor boards, with links, as of November 2026: the caps and their exceptions, the states that use escrow, trust or permit rules instead, deposit vs down payment, a worked example in a capped and an uncapped state, refund rules, and deposit wording for your estimate.

This is general information, not legal advice. Rules change; check your state's current statute or ask a lawyer.

What deposit is typical, and what drives it

How much can a contractor ask for up front? We didn't find a government survey of what contractors actually charge, so this guide won't quote a "typical" percentage. The law shows the range of ceilings: where states cap deposits on residential work, the limit runs from $1,000 to about one-third of the price. Everywhere else, the deposit is a business decision you write into your contract.

Make it by asking what you'll spend, or commit to, before the first day of work. A deposit keeps you from carrying the client's job on your own cash and covers what you can't get back if they walk away. It isn't a way to collect your profit early. The factors that move it:

Factor Why it matters Examples
Special-order materials You pay the supplier before install, and you usually can't return them Windows built to size, countertops cut from a slab, composite decking in the client's color
Stock materials Returnable, or usable on another job, so less risk Framing lumber, drywall, standard fixtures
Permits, design and engineering Paid before work starts and lost if the job dies Permit fees, drawings, an engineer's letter
Schedule risk You hold a crew slot and turn other work down A two-week job booked six weeks out in your busy season
Job size and length Small, short jobs carry little up-front cost Service calls and one-day repairs, often paid on completion
The client A repeat client with a payment history is less risk A property manager you've invoiced for years

Small jobs often need no deposit at all. California's simpler "service and repair contract" (section 7159.10), for home improvement jobs of $750 or less, is only available when no payment is due or accepted until the work is completed.

So what is a reasonable deposit for a contractor? One that covers what you commit before day one (special-order materials, permits, design), maybe plus a modest amount for holding the date, and that stays under your state's cap. If that number is above the cap, the fix is a payment schedule, not a bigger deposit: bill the materials when they arrive at the site, as the worked example below shows.

Contractor deposit laws by state, as of November 2026

These are the rules we verified on official sources (state legislatures, statutes and contractor boards), as of November 2026. This is not a 50-state survey, and a state that isn't listed may still regulate deposits in other ways (see the section after next).

State The rule What it applies to Source
California Down payment of no more than $1,000 or 10% of the price, whichever is less. After that, no payment ahead of the work performed or material delivered Home improvement contracts, including ADUs and residential solar B&P 7159.5; CSLB bulletin
Nevada Down payment or deposit of no more than $1,000 or 10% of the price, whichever is less, unless you've filed a $100,000 consumer protection bond Residential improvement on existing, owner-occupied single-family homes (AB 39, in force since October 1, 2023), and residential pools and spas NSCB bulletin on AB 39; NSCB bonds page; NSCB pool guide
Maryland No payment before the contract is signed, and a deposit of no more than one-third of the price at or before signing Home improvement contracts Bus. Reg. 8-617
Massachusetts Deposit before work starts of no more than the greater of one-third of the price or the actual cost of special-order or custom-made materials or equipment Contracts over $1,000 for work on a pre-existing, owner-occupied building with one to four units c. 142A, s. 2
Pennsylvania No payment before the contract is signed. Deposit of no more than one-third of the price, or one-third plus the cost of special-order materials designated in the contract Home improvement contracts over $5,000 (the act covers work over $500 at a private residence) HICPA section 9 (73 P.S. 517.9)
Maine Initial down payment of no more than one-third of the price Home construction contracts over $3,000 to build, remodel or repair a residence, unless both sides opt out 10 M.R.S. 1487; 1489
Florida No cap. An initial payment over 10% means applying for permits within 30 days and starting within 90 days after they issue, unless you have just cause or a written extension Work on residential real property F.S. 489.126
New York No cap. Payments before substantial completion go into escrow at a New York bank within five business days, or you give the owner a bond or letter of credit Home improvement contracts over $500 GBL 771; Lien Law 71-a
Texas No cap. Construction payments are trust funds; on a written homestead contract over $5,000 they go into a construction account Construction contracts to improve real property Property Code ch. 162
Virginia No percentage cap in the board's rules. The contract must state the amount of the down payment Residential contracting 18VAC50-22-260
Arizona No cap. The contract must state the dollar amount of any advance deposit Contracts over $1,000 between a contractor and a property owner A.R.S. 32-1158

Who the caps cover, and the exceptions

A cap applies only to the work its statute covers, and most have exceptions. Check four things before you rely on a number in the table.

  • Is the job residential? Every cap above is written for homes. None of them, as written, reaches commercial work, where your contract sets the deposit.
  • Is it over the threshold? Pennsylvania's cap starts above $5,000 (the text as amended in July 2011), Maine's above $3,000 and Massachusetts's above $1,000. If a guide quotes another threshold, check its date.
  • Is it "home improvement" under that statute? The definitions are broad. Pennsylvania's covers roofs, siding, pools, solar, security systems, flooring, fences, landscaping and painting at a private residence, but not building a new home.
  • Do you qualify for an exception? The main ones:

California. A contractor who furnishes a performance and payment bond, a lien and completion bond, or a bond equivalent or joint control approved by the registrar, covering full performance and payment, is exempt from the down payment cap and the progress payment rules (section 7159.5(a)(8)); to apply for the blanket version, you need an active license for at least two years. Without it, an oversized down payment or a payment ahead of the work is a misdemeanor: a fine of $100 to $5,000, up to a year in county jail, or both, with the maximum fine required in areas damaged by a declared natural disaster. The CSLB can also discipline your license.

Nevada. The limit doesn't apply if you've filed a $100,000 bond solely for the protection of consumers, or no longer have to post a standard license bond, according to the Nevada State Contractors Board.

Massachusetts. Because the rule is "the greater of," special-order windows that cost more than a third of the price can be covered at their actual cost. You also can't demand final payment until the work is completed to the satisfaction of both parties.

Pennsylvania. The contract must list the down payment and any special-order materials as separate lines (section 7(a)(9)).

Maine. Under section 1489, the parties can agree to a contract without the required terms, including the one-third limit, but only if the contractor first specifically informs the homeowner of their rights.

Maryland has no exception in the section, and its first sentence matters as much as the cap: no payment of any kind before the contract is signed.

States with no cap: escrow, trust and permit rules

If your state isn't in the table, don't read that as "no rules." We didn't check all 50 states, and "no cap found" doesn't mean the money is unregulated: states also use licensing and contract-content laws, trust-fund statutes that make construction payments the job's money rather than yours, permit-and-start deadlines and fraud statutes about advances. Cities and counties can add their own rules too. Four examples:

Florida: a trigger, not a cap

Florida's section 489.126 doesn't limit the deposit; it attaches deadlines to a big one. If your initial payment on residential work is more than 10% of the contract price, you must apply for permits within 30 days of the payment (unless the work needs none) and start within 90 days after the permits are issued, unless you have just cause or the client agreed in writing to a longer period. If you miss them, the client can send a written demand by certified mail, and if you don't act within 30 days of it, you're presumed to lack just cause.

A contractor paid more than the value of the work done also may not fail or refuse to perform any work for any 90-day period, and failing to refund within 30 days of the owner's written demand lets a court infer criminal intent. Penalties run from a first-degree misdemeanor under $1,000 to a first-degree felony at $200,000 or more. Separately, section 713.345 makes it a felony to knowingly and intentionally fail to apply payments to what's then owed for labor and materials on that job.

New York: escrow or a bond

New York sets no percentage, but a payment received before the work is substantially complete stays the owner's money until you earn it. Under Lien Law 71-a(4), you deposit it within five business days in an escrow account at a bank or savings institution in New York, and if the contract doesn't name the bank, you tell the owner in writing within ten business days where it is. Instead, you can give the owner a surety bond or contract of indemnity, or an irrevocable letter of credit, within ten business days of the payment.

The money stays the owner's until you apply it under the payment schedule, the contract is substantially performed, or the owner defaults (and then only up to reasonable liquidated damages set in the contract, after seven days' written notice). GBL 771 requires the contract to explain the escrow-or-bond rule and to show progress payments in dollars and cents; payments on a stated hourly or time basis for completed work or supplied materials don't have to be escrowed. It all applies to home improvement contracts over $500 (GBL 770).

Texas: trust funds and a construction account

Under Property Code chapter 162, construction payments to a contractor for improving real property in Texas are trust funds, the contractor who receives them is a trustee, and on a residential construction contract the property owner is a beneficiary. On a written contract over $5,000 to improve the owner's residential homestead, you must deposit the funds in an account your bank's statements call a "construction account."

Misapplying $500 or more of trust funds is a Class A misdemeanor, or a third-degree felony with intent to defraud, and failing to keep the required construction account is a Class A misdemeanor. In practice, a Texas deposit pays for that client's job, such as the supplier invoice for their special-order materials, not last month's truck payment.

Virginia and Arizona: state the amount

Virginia's Board for Contractors requires a residential contract to show the amounts and schedule of progress payments, "including a specific statement on the amount of the down payment" (18VAC50-22-260). Some pages online say Virginia limits deposits to about a third; we found no percentage cap in that rule. It does list retaining or misapplying funds for work not performed as a prohibited act, and under section 18.2-200.1, taking an advance with fraudulent intent and not performing is larceny if the advance isn't returned within 15 days of a certified-mail request.

Arizona's A.R.S. 32-1158 requires contracts over $1,000 with a property owner to state the dollar amount of any advance deposit and of each progress payment, with the stage when it's due. No cap.

Deposit vs down payment vs progress payment

Deposit vs down payment is mostly a vocabulary question. The statutes use the words for the same thing: California says "downpayment," Maryland, Massachusetts and Pennsylvania say "deposit," Nevada says "down payment or deposit" and Maine "initial down payment." Whatever you call it, a cap applies to the money you take at or before signing.

In everyday use, "deposit" suggests security that may come back, and "down payment" the first installment of the price. Cornell's Legal Information Institute describes a down payment as the first portion of the price, paid when the contract is made, which may be forfeited or refunded depending on who failed to perform. So don't rely on the label to make money non-refundable; put the rule in the contract.

Term What it is When it's paid What the law usually says
Deposit or down payment The first payment, credited to the price At signing, before work starts Capped in some states; escrowed, bonded or held in trust in others
Progress payment A payment for a finished stage or delivered materials During the job, after the stage it pays for California and others: never ahead of the work done or material delivered
Final payment The balance At completion Massachusetts: not demanded until the work is done to both sides' satisfaction
Retainage A share of each progress payment the client holds back Released at completion Mostly commercial and public work

Retainage is the reverse of a deposit: the client holds your money instead of you holding theirs, and it's rare on residential jobs. On federal construction contracts, FAR 32.103 allows it only when progress isn't satisfactory, caps it at 10 percent of the approved estimated amount, and requires prompt payment once the contract is complete.

Can a contractor ask for 50% up front?

It depends on the state and the job. On a $14,500 residential job, 50% is $7,250:

  • California and Nevada: no. The most is $1,000, unless you qualify for the bond exceptions.
  • Maryland and Maine: no. The most is one-third, $4,833.33 (in Maine, unless both sides opt out).
  • Massachusetts: only if the special-order or custom-made materials cost $7,250 or more, since the cap is the greater of one-third or that cost.
  • Pennsylvania: only with special-order materials designated in the contract worth at least $2,416.67, since $4,833.33 + $2,416.67 = $7,250.
  • Florida, New York, Texas: legal, but with the permit deadlines, escrow or trust rules above.
  • Commercial work, and states where we found no rule: generally a matter of your contract, subject to licensing, trust-fund and fraud laws.

Legal isn't the same as smart. A 50% deposit you can't justify with special-order materials and permits is one you may have to refund, and an easy objection for a client comparing three quotes. California's contractor board titles a consumer alert "Don't Pay Too Much Money Upfront on Home Improvement Projects", and your clients may have read it.

Setting your own deposit policy: a worked example

Say you run a three-person crew and quote a deck replacement at $14,500. Your own build-up (illustrative numbers, not market rates):

Line Amount
Composite decking and railing, special order in the client's color $4,200
Framing lumber, footings and hardware $1,900
Permit $350
Labor $5,100
Demolition, haul-away and dumpster $450
Overhead and profit $2,500
Total $14,500

If you're not sure what your overhead and profit line should be as a share of the price, run it through the markup vs margin calculator first: the deposit shouldn't include it.

In an uncapped state: Texas

Say the deck is at the client's homestead in Austin.

  1. What you commit before day one: decking and railing $4,200 + permit $350 = $4,550.
  2. As a share of the price: $4,550 / $14,500 = 0.314, about 31%.
  3. Under a self-imposed one-third ceiling? One-third is $14,500 / 3 = $4,833.33, so yes.
  4. Payment schedule: $4,550 at signing; $4,950 when the old deck is removed and the footings and framing pass inspection; $5,000 at completion and walkthrough. Check: $4,550 + $4,950 + $5,000 = $14,500.
  5. Texas specifics: the contract is written, over $5,000 and on a residential homestead, so the deposit goes into a construction account, and it should pay the decking supplier.

In a capped state: California

Same job in San Diego.

  1. 10% of the price: $14,500 times 0.10 = $1,450.
  2. The cap is the lesser of $1,000 and $1,450, so the most you can take at signing is $1,000.
  3. The gap you carry: $4,550 committed - $1,000 collected = $3,550 of your own cash until the materials arrive.
  4. Payment schedule: $1,000 down payment at signing; $5,100 when the decking, railing and framing lumber are delivered to the site; $5,400 when the old deck is out, framing passes inspection and the decking is installed; $3,000 at completion. Check: $1,000 + $5,100 + $5,400 + $3,000 = $14,500.
  5. Check the second payment: after it you've collected $1,000 + $5,100 = $6,100, which equals the cost of the materials sitting on the site ($4,200 + $1,900). Each later payment is due only after the work it pays for is done.

The $3,550 gap is the real cost of the cap. Ways to shrink it: order the special-order materials so they arrive close to the start date, ask your supplier for terms, or, if you do a lot of this work, look at the bond exemption.

The same job, state by state

State Most you can take at signing on $14,500 The arithmetic
California $1,000 10% is $1,450, more than $1,000
Nevada (owner-occupied single-family home) $1,000 Same, unless you've filed the $100,000 consumer bond
Maryland $4,833.33 $14,500 / 3, rounded down
Massachusetts $4,833.33 The greater of $4,833.33 and the $4,200 special order
Pennsylvania $9,033.33 $4,833.33 + $4,200 special order designated in the contract; $4,833.33 without it
Maine $4,833.33 One-third, unless both sides opt out
Florida No cap More than $1,450 (10%) starts the 30-day permit and 90-day start clocks
New York No cap Anything paid before substantial completion is escrowed within 5 business days or bonded
Texas No cap Homestead contract over $5,000: into a construction account

Round one-third down, not up: $4,833.34 is more than one-third of $14,500.

A deposit policy you can copy

  1. Start from committed costs: special-order materials, permits, design and engineering for this job.
  2. Cap it at your state's limit for this kind of work, and at your own ceiling, such as one-third.
  3. If committed costs exceed the cap, move them into a progress payment due on delivery to the site.
  4. Tie every later payment to an event the client can see: delivery, inspection passed, stage installed, completion.
  5. Don't order special-order materials until any cancellation period has run out.
  6. Write down what happens to the deposit if the client cancels (wording below).

Refunds, cancellation and the FTC 3-day rule

Inside the cancellation period, the deposit goes back. If you sell at the client's home, the FTC's Cooling-Off Rule generally lets the buyer cancel until midnight of the third business day after the sale (any day but Sunday and federal holidays counts), and you must refund all payments within 10 business days of receiving the cancellation notice. It covers sales of $25 or more at the buyer's home, with exceptions such as repairs the buyer asked you to come and do, and bona fide emergencies where the buyer waives the right in a dated, signed, handwritten statement. States add their own rights: Pennsylvania lets the owner rescind a home improvement contract within three business days wherever it was signed (section 7(b)), and a New York contract must tell the owner they can cancel until midnight of the third business day. Our guide to e-signatures and the FTC 3-day rule covers the notice when the client signs on a phone. The practical rule: don't spend the deposit on non-returnable materials until the window closes.

After that, can a contractor keep the deposit if the client cancels? It depends on your contract and your state. A down payment may be forfeited or refunded depending on which party failed to perform. A clause that lets you keep a set amount is a form of liquidated damages, and courts won't enforce one that's punitive or unconscionable. The defensible position is to keep what the cancellation actually cost you (special-order materials, restocking fees, permit and design fees) and refund the rest with receipts. In New York, you can keep escrowed money after an owner's default only up to reasonable liquidated damages stated in the contract, and only after seven days' written notice.

If the delay is on your side, the refund clocks are short. Pennsylvania requires a refund within ten days of a certified-mail request when no substantial portion of the work has been done and more than 45 days have passed since the contract's start date (section 9(2)). In Florida, failing to refund within 30 days of a written demand can be evidence of criminal intent. In Virginia, an advance taken with fraudulent intent and not returned within 15 days of a certified-mail request is treated as larceny. If you can't start when you said, call the client before they send a letter.

Putting the deposit on the estimate: wording

Write the deposit as a dollar amount tied to what it pays for, not a bare percentage. These are starting points to adapt; have a local lawyer review your contract once. (Our guide on how to write a contractor estimate shows where payment terms sit on the page, and the free estimate template has the fields.)

Uncapped state, cost-based deposit:

Deposit: $4,550.00, due when you sign. It covers your special-order composite decking and railing ($4,200.00), which we order after your cancellation period ends and can't return, and the permit fee ($350.00). Second payment: $4,950.00 when the old deck is removed and the framing passes inspection. Final payment: $5,000.00 when the deck is complete and we've walked it with you.

California, with the statement section 7159 requires under the heading "Down Payment," in at least 12-point bold type, per the CSLB:

Down Payment: $1,000.00

THE DOWN PAYMENT MAY NOT EXCEED $1,000 OR 10 PERCENT OF THE CONTRACT PRICE, WHICHEVER IS LESS.

With progress payments, add the heading "Schedule of Progress Payments," each payment in dollars and cents with the work or materials it pays for, and the required bold statement that collecting for work not yet completed or materials not yet delivered is against the law.

Pennsylvania, with the special-order amount on its own line:

Down payment: $4,833.33. Special-order materials: composite decking and railing in the color you chose, $4,200.00, ordered after the rescission period. Total due at signing: $9,033.33.

Cancellation after the cooling-off period:

If you cancel after your cancellation period ends, we'll refund your deposit minus the costs we've already incurred for your job and can't recover, such as special-order materials, restocking fees and permit fees. We'll send you the receipts with the refund.

For recurring work (a cleaning contract, a maintenance plan, a managed IT retainer), take the deposit on what's due at the start, not on a year of service. If you'd rather not build this by hand, Itsquoted puts the deposit on the quote, takes it on what's due at the start when the quote has monthly or yearly lines, and has the client sign on their phone and pay through your own payment link.

FAQ

How much deposit can a contractor legally ask for?

It depends on the state and the work. On residential jobs, California and Nevada cap it at $1,000 or 10% of the price, whichever is less; Maryland and Maine (over $3,000) at one-third; Massachusetts at the greater of one-third or the cost of special-order materials; and Pennsylvania (over $5,000) at one-third plus designated special-order materials. Other states, such as Florida, New York and Texas, set no cap but have permit, escrow or trust rules.

Not on covered residential work in California, Nevada, Maryland or Maine, and in Massachusetts and Pennsylvania only when special-order materials make up enough of the price. In Florida, New York and Texas it's legal but comes with permit deadlines, escrow or trust-fund rules. On commercial work and in states without a rule, it's a matter of your contract.

Can a contractor keep the deposit if the client cancels?

Not within a legal cooling-off period: under the FTC rule, all payments go back within 10 business days. After that, it depends on the contract and state law; the safest approach is to keep only documented costs you can't recover and refund the rest.

What is the difference between a deposit and a down payment?

In the deposit statutes in this guide, nothing: both mean the money paid at or before signing, credited to the price. In everyday use, "deposit" suggests security that may be returned and "down payment" suggests the first installment. Your contract, not the word, decides whether any of it is refundable.

How much should I ask for as a deposit as a contractor?

Enough to cover what you'll commit before the first day of work, such as special-order materials, permits and design, and no more than your state's cap. If those costs are higher than the cap, collect them in a progress payment due when the materials arrive on site.

What is the contractor deposit law in California?

Under Business and Professions Code section 7159.5, the down payment on a home improvement contract can't exceed $1,000 or 10% of the price, whichever is less, and later payments can't get ahead of the work performed or materials delivered. Contractors with certain approved bonds are exempt. A violation is a misdemeanor.

What is the contractor deposit law in Texas?

Texas sets no deposit cap. Construction payments are trust funds under Property Code chapter 162, and on a written contract over $5,000 to improve a residential homestead they must go into a construction account. Misapplying $500 or more is a crime.

What is the contractor deposit law in Florida?

Florida sets no cap, but if your initial payment on residential work is more than 10% of the price, you must apply for permits within 30 days and start within 90 days after they're issued, unless you have just cause or the client agrees in writing to longer. Misusing the money can be a crime.

About the author

has been a software developer for 25 years and is an AI specialist. He founded Itsquoted, which turns a voice memo into a quote clients can sign on their phone.

Send your next quote before you leave the job

Record a voice memo, review the quote, and send it. Your client picks an option, signs and pays the deposit on their phone. 14 days free.

No credit card needed

Continue in your browser

Google sign-in does not work inside apps like Facebook or Instagram.