Skip to main content

Free tool

Markup vs margin calculator

Enter what a job costs you and the markup, the margin you want, or the price you plan to charge. You get the rest, and see why a 50% markup is only a 33% margin.

Runs in your browser. Nothing you type or upload leaves this page.

Your numbers

What do you know?

Everything the job costs you: labor, materials, equipment, permits and subcontractors.

The percent you add on top of your cost.

Result

Enter your cost and one more number to see the price, profit, markup and margin.

Markup to margin chart
Markup Margin
10% 9.1%
15% 13%
20% 16.7%
25% 20%
30% 23.1%
35% 25.9%
40% 28.6%
50% 33.3%
60% 37.5%
75% 42.9%
100% 50%
150% 60%

Markup vs margin: the difference

Markup is your profit as a percent of your cost. Margin is the same profit as a percent of the price. Both describe the same dollars measured against a different base, which is why the margin is always the smaller number.

  • Markup = (price - cost) / cost
  • Margin = (price - cost) / price
  • Price from a markup = cost x (1 + markup)
  • Price from a margin = cost / (1 - margin)

A worked example

Say a water heater install costs you $1,200 in labor, parts and disposal. With a 50% markup you charge $1,800 and make $600. That $600 is 50% of your cost but only 33.3% of the price, so your margin is 33.3%. To keep half of the price, you would charge $1,200 / (1 - 0.50) = $2,400, which is a 100% markup.

Why mixing them up costs money

Overhead such as the shop, trucks, insurance and office pay is usually budgeted as a share of revenue, so it has to come out of your margin. If you need a 40% gross margin to cover overhead and profit and you add a 40% markup instead, your margin is 28.6%: more than 11 points short on every job.

Converting markup to margin and back

  • Margin = markup / (1 + markup). A 25% markup is a 20% margin.
  • Markup = margin / (1 - margin). A 30% margin needs a 42.9% markup.

The chart next to the calculator has the common pairs.

Which costs to include

Use the full direct cost of the job: labor at your loaded hourly cost (wages plus payroll taxes, workers' comp and benefits), materials at what you paid including delivery and waste, equipment rental, permits, dump fees and subcontractors. Overhead you can't tie to one job is paid from the margin, so don't add it to the cost as well.

Price from a target margin

Pick a target gross margin for each type of work and price from it, instead of adding the same markup out of habit. Check the margin on each option you offer: a cheaper Good option can carry a thinner margin than you think. If you quote with Itsquoted, you can enter your cost on each line and see the margin of every option before you send it. The client never sees your costs.

Guides

More free tools

Quote it on the spot

Say the job after the walkthrough and send a quote your client can sign and pay a deposit on from their phone. 14 days free.

No credit card needed

Continue in your browser

Google sign-in does not work inside apps like Facebook or Instagram.