Pricing
Good, Better, Best Pricing for Contractors: How to Build Options Clients Pick
By Doron Sol. Updated November 24, 2026. 20 min read.
Short answer
Good, Better, Best pricing means quoting one job three ways: the complete basic job, a recommended version with the upgrades this client cares about, and a premium version. Build each tier from its own scope and cost, check that each one makes your margin, and mark the one you recommend. Research shows middle options gain share when buyers are unsure, so track which tier your clients pick.
On this page
- What Good, Better, Best pricing is, and why three options work
- Build the tiers from scope, not by marking up one price
- Good, Better, Best pricing examples by trade
- How to price each tier: margin and price gaps, worked through
- Add-ons vs tiers: which goes where
- Presenting the options: on paper and on a phone
- Recurring options: the job alone, or the job plus a plan
- Should you show monthly payments on each tier?
- Measuring which tier clients pick and your close rate
- Common mistakes with Good, Better, Best pricing
- FAQ
Good, Better, Best pricing means giving a client three complete versions of the same job at three prices and letting them pick one. Done well, it turns "should we hire them?" into "which option do we want?" Done badly, it's one price marked up twice, with a top tier nobody believes. This guide covers building the tiers from scope, cost and margin; line-item examples for five trades; a worked pricing example with every number shown; what the research on the compromise and decoy effects actually found; presenting options on a phone; and measuring which tier clients pick.
What Good, Better, Best pricing is, and why three options work
A Good, Better, Best proposal shows the same job three ways:
- Good: the complete job done right, with standard materials. Not a stripped-down version that sets up a change order.
- Better: Good plus the upgrades you'd recommend for this client after the walkthrough.
- Best: everything worth doing, with the best materials, the longest warranty or the most service.
Rafi Mohammed's 2018 Harvard Business Review article, The Good-Better-Best Approach to Pricing, makes the business case: discounting to win price-sensitive buyers eats profit, and a single offer gives buyers who'd pay for more nothing to buy. Tiers serve both. The research on why three options help is real, and more limited than most advice admits.
The compromise effect: the middle option gains share
In Simonson (1989), published in the Journal of Consumer Research, products gained share when they became the compromise option in a set, and the effect was stronger when people expected to justify their choice to others (see the abstract at Stanford). A homeowner explaining the spend to a partner is in exactly that position.
A later lab study puts numbers on it. In Chernev (2005), 429 students chose between equally priced products rated on two features. When a third option made a product the middle choice, its share against its neighbor rose from 50.0% to 57.8%. More useful for quoting: a balanced option, equally good on both features, was chosen most often even at the end of the row (53.1% and 63.3% of choices). So make Better the balanced tier, solid on everything the client cares about, not one big upgrade bolted onto Good.
The decoy effect: why a fake tier doesn't work
Huber, Payne and Puto (1982) showed that adding an option clearly worse than one choice, but not worse than the other, raises the share of the option that beats it. That's the decoy effect, and it's why some advice says to build a top tier designed not to sell.
Read the authors' own 2014 commentary first. Their decoys were built to be obviously dominated, and only about 2% of people picked one. The effect weakens when people already have firm preferences or can't see the comparison quickly, and the authors suspect the strict decoy effect is rare in real markets, where products differ in many ways. What they see working more often is the compromise setup: a pricier, better option above the one the seller wants to sell and a cheaper one below. Real tiers, not a planted bad deal.
Price anchoring: the first number sets the scale
In Tversky and Kahneman (1974), people saw a wheel of fortune stop on a number, then estimated the percentage of African countries in the United Nations. The group that got 10 gave a median estimate of 25; the group that got 65 gave 45, and paying for accuracy didn't remove the effect. In a quote, the Best tier sets the top of the range. It doesn't have to sell often to do that, but it has to be a job you'd gladly do at that price.
What the trade data says
The contractor numbers you'll see quoted come from the Contractor of the Future study by ACCA and Farmington Consulting Group, a survey of more than 1,000 HVACR contractors released in December 2025. ACCA's summary says contractors who present at least four options see close rates 10% higher than those using a traditional three-option approach, and their premium equipment mix rises from 26% to 42% of sales. A March 2026 write-up in PHCP Pros gives the close rates as 52% for four or more options against 42% for one to three, and says only 10% of contractors offer four or more.
Treat those as encouraging, not as a forecast. The summaries don't define close rate or describe the method, and a survey shows correlation: contractors who present more options may also be better at follow-up and pricing. Taken together: tiers help most when the client is unsure, the differences are easy to compare, and every tier is a real job.
Build the tiers from scope, not by marking up one price
The fastest way to make tiers is to write one price and add 25% and 50%. It's also the way that loses money (the worked example below shows how). Build each tier as its own scope, then cost it:
- Write Good as the complete job. Everything needed to fix what the client called about, to code, with materials you'd stand behind. If you wouldn't put your name on it, it's a change order waiting to happen.
- List the upgrades this client could value. Sort them by what they change: how long the work lasts, how it looks or performs, how much hassle it saves and how much risk it removes.
- Build Better from the two or three upgrades you'd recommend. "You said the trim bugs you" is a reason; "premium package" is not.
- Build Best from everything else worth doing. No filler.
- Cost every line: labor hours, materials, equipment, subs and permits. Then price each tier from its own cost.
- Write each step up in one sentence: "Everything in Good, plus trim, doors and a scrubbable wall paint." If you can't, the tiers are too alike or too muddled.
Before you send, run the quote through this check:
Tier check
- Good solves the whole problem and meets code.
- Each tier is a full job the client could sign without another conversation.
- Items shared by all tiers are listed once ("All options include...").
- Each step up names something the client can see, feel or avoid.
- Better matches what the client said they care about.
- Best contains nothing you'd be embarrassed to explain.
- Every tier makes your minimum margin.
- What's not included is written down.
Skip tiers when there's one right answer. A gas leak, a code-required fix or a simple service call gets one price; options there read as an upsell.
Good, Better, Best pricing examples by trade
Here's what tiers look like with real line items. These are example prices for illustration, not market rates; build yours from your own costs, as the next section does. The names don't have to be Good, Better and Best: "Good" can sound cheap, and Essentials, Standard and Complete work just as well.
House cleaning: 3-bedroom, 2-bath home every two weeks
All options start with a one-time deep clean: $240.
| Option | What's included | Example price |
|---|---|---|
| Standard | Kitchen counters, sink, stovetop and appliance fronts; both bathrooms; dust reachable surfaces; vacuum and mop all floors; empty trash | $150 a visit |
| Standard plus detail | Everything in Standard, plus one rotating detail task each visit (baseboards, blinds or inside the microwave), and light switches and door handles wiped | $175 a visit |
| Full care | Everything in Standard plus detail, plus inside the fridge and oven once a month, interior windows once a quarter, and fresh bed linens each visit | $215 a visit |
For setting the base rate itself, see how much to charge for house cleaning.
HVAC: replacing a 15-year-old 3-ton central AC
All options include the permit, a new equipment pad, refrigerant lines checked or replaced as needed, a start-up test and haul-away of the old unit. The existing furnace stays.
| Option | What's included | Example price |
|---|---|---|
| Good | Single-stage AC and matching indoor coil, programmable thermostat, 1-year labor warranty | $7,800 |
| Better | Two-stage AC and matching coil, smart thermostat, surge protector, 5-year labor warranty, first year of the maintenance plan | $10,400 |
| Best | Variable-speed AC and matching coil, communicating thermostat, media filter cabinet, surge protector, 10-year labor warranty, two years of the maintenance plan | $14,200 |
Interior painting: living room, hallway and two bedrooms
| Option | What's included | Example price |
|---|---|---|
| Good | Walls only, two coats in the current colors, nail holes patched, furniture moved and covered | $2,400 |
| Better | Everything in Good, plus trim, doors and baseboards, gaps caulked, and a premium scrubbable wall paint | $3,900 |
| Best | Everything in Better, plus ceilings, closets, drywall repair beyond nail holes, and a touch-up visit after one year | $5,600 |
The next section works out these prices. For measuring and bidding the job itself, see how to bid a painting job.
Landscaping: spring bed refresh, front and back yard
| Option | What's included | Example price |
|---|---|---|
| Good | Leaves and debris cleared from beds, beds edged and weeded, shrubs pruned, 4 cubic yards of hardwood mulch spread | $850 |
| Better | Everything in Good, plus pre-emergent weed control in beds, 12 one-gallon perennials planted in bare spots, and lawn core aeration | $1,450 |
| Best | Everything in Better, plus 3 new foundation shrubs, a drip line with a timer for the front beds, and monthly bed care April through October | $2,600, plus $95 a month |
IT services: 8-person office, priced per user
Every option includes onboarding (inventory, documentation, account cleanup): $1,200 one-time.
| Option | What's included | Example price |
|---|---|---|
| Essentials | Remote help desk in business hours, patching for computers, endpoint protection, Microsoft 365 administration, monthly report | $95 per user a month ($760 a month) |
| Standard | Everything in Essentials, plus backup for Microsoft 365 email and files, email filtering, security awareness training, and onsite visits when needed | $135 per user a month ($1,080 a month) |
| Complete | Everything in Standard, plus after-hours support for critical issues, 24/7 security monitoring, a quarterly planning meeting, and help with cyber insurance questionnaires | $185 per user a month ($1,480 a month) |
The pattern in all five: shared items stated once, each tier written as "everything in the last one, plus", and every step up something the client can picture.
How to price each tier: margin and price gaps, worked through
Here's how the painting prices above were built. Swap in your own numbers.
Assumptions (yours will differ):
- Labor. Say you pay your painters $25 an hour, close to the $23.75 national median for painters in May 2025 (BLS). In private industry, wages were 70.0% of employer compensation costs in June 2026, with benefits and payroll costs the other 30.0% (BLS Employer Costs for Employee Compensation). So your loaded cost is about $25 / 0.70 = $35.71; call it $36 an hour.
- Paint. Contractor-grade wall paint $38 a gallon, premium wall paint $62, trim enamel $70, ceiling paint $40.
- Target. A 45% gross margin on every tier, to cover overhead (insurance, vehicles, office, marketing, your own time) and profit. Price = direct cost / (1 - 0.45), which is direct cost / 0.55.
Step 1: direct cost of each tier
Good
- Labor: 28 hours x $36 = $1,008
- Paint: 6 gallons x $38 = $228
- Supplies (tape, plastic, patch, roller covers): $84
- Direct cost: $1,008 + $228 + $84 = $1,320
Better
- Labor: 42 hours x $36 = $1,512
- Paint: 6 gallons premium x $62 = $372, plus 2 gallons enamel x $70 = $140, so $512
- Supplies (adds caulk): $128
- Direct cost: $1,512 + $512 + $128 = $2,152
Best
- Labor: 60 hours x $36 = $2,160 (including 4 hours for the touch-up visit)
- Paint: Better's $512, plus 3 gallons ceiling paint x $40 = $120, plus 2 gallons for closets x $62 = $124, so $756
- Supplies (adds drywall tape and compound): $180
- Direct cost: $2,160 + $756 + $180 = $3,096
Step 2: price each tier from its own cost
| Good | Better | Best | |
|---|---|---|---|
| Direct cost | $1,320 | $2,152 | $3,096 |
| Direct cost / 0.55 | $2,400 | $3,913 | $5,629 |
| Price (rounded) | $2,400 | $3,900 | $5,600 |
| Gross profit | $1,080 | $1,748 | $2,504 |
| Gross margin | 45.0% | 44.8% | 44.7% |
| Labor hours | 28 | 42 | 60 |
| Gross profit per labor hour | $38.57 | $41.62 | $41.73 |
Gross profit per labor hour is the check small teams skip. Crew hours are what you run out of first, so a tier that takes twice the time should bring in twice the profit. Here every tier earns about the same per hour, so you're glad whichever one the client picks.
Step 3: compare with marking up one price
Now the shortcut: Good at $2,400, Better at 25% more ($3,000), Best at 50% more ($3,600).
- Better: $3,000 - $2,152 = $848 gross profit. That's a 28.3% margin and $848 / 42 = $20.19 per labor hour.
- Best: $3,600 - $3,096 = $504 gross profit. That's a 14.0% margin and $504 / 60 = $8.40 per labor hour.
The tier you expect most clients to pick now earns about half of what Good earns per hour, and Best doesn't come close to covering overhead. Every upgrade costs you money.
Step 4: check the price gaps
There's no research-backed ratio for the gaps between tiers, so test each step against what the client gets:
- Good to Better: +$1,500 (62.5% more) for trim, doors, baseboards, caulking and a scrubbable wall paint. All visible, and the trim is what the client pointed at.
- Better to Best: +$1,700 (43.6% more) for ceilings, closets, real drywall repair and a touch-up visit.
- Overall: Best is 2.33 times Good.
Ask three questions of each step. Can you say what it buys in one sentence? Given what this client told you, will it seem worth it? Is it cheaper than doing that work later as a separate trip? If a step fails, move lines between tiers (offer the trim as an add-on to Good, say) instead of cutting a price below your margin floor.
One more trap: margin isn't markup. A 45% margin means pricing at cost / 0.55, which is an 82% markup on cost. If you add 45% to cost instead, you get a 31% margin ($100 cost, $145 price, $45 / $145 = 31%).
Add-ons vs tiers: which goes where
Tiers and add-ons do different jobs. Tiers are versions of the core job, and the client picks one. Add-ons are separate extras the client can tick on top of any tier.
| Tiers | Add-ons | |
|---|---|---|
| What changes | How well the core job is done: materials, depth of scope, warranty, service level | Something separate that fits any tier |
| What the client does | Picks one | Ticks any, or none |
| Cleaning | Standard, plus detail, full care | Inside windows, laundry, garage sweep-out |
| HVAC | Single-stage, two-stage, variable-speed | Air purifier, duct sealing, extra return |
| Painting | Walls, plus trim, plus ceilings and closets | Accent wall, cabinet doors, deck stain |
| Landscaping | Cleanup, plus plants, plus irrigation and care | Gutter cleaning, extra mulch, holiday lights |
| IT services | Essentials, Standard, Complete | New laptop setup, Wi-Fi upgrade, extra users |
The rule: if an item changes how well the main job is done, it's a tier difference. If it makes sense with every tier and a client might want it on its own, it's an add-on.
Add-ons are also how contractors reach "four or more options" without a fourth tier: ACCA's summary counts indoor air quality add-ons and warranty packages among the options.
Keep the add-ons to the few that fit this job. More choices don't reliably backfire: a meta-analysis of 50 experiments on choice overload (Scheibehenne, Greifeneder and Todd, 2010) found an average effect near zero, with wide variation between studies. But a long menu turns your quote into a catalog, and the client starts designing the job instead of choosing. Three tiers plus three to five relevant add-ons is a sensible ceiling.
Presenting the options: on paper and on a phone
If your quote goes out as a link or an email, assume the client reads it on a phone, often days after the walkthrough, without you there to explain it.
On paper or PDF
Three columns side by side work on a letter-size page: shared items across the top, the recommended column shaded, a total under each column. Check every column's math; one wrong total makes the client doubt all three.
On a phone
Three columns don't fit on a phone screen, so the layout has to change:
- Stack the tiers as cards, each with a name, a one-line summary, the price and its "everything in the last one, plus" list.
- Put items shared by all tiers once, above the cards.
- Put add-ons below the tiers as checkboxes with prices, and update the total as the client taps.
- Show what's not included, the deposit and how to sign on the same page.
- Keep line items short. Long paragraphs get skipped on a small screen.
Which tier to highlight
Mark the one you'd recommend and give one reason in the client's own terms: "Recommended: you said the chipped trim bothers you, and this covers it." That's usually Better. The research above found people lean toward options that are easy to justify, especially when they'll have to explain the choice to someone else. A one-line reason hands them that explanation.
If you can, walk the client through the options in person or on a call, say which you'd pick and why, then let them choose. There's no solid trade data on whether to list Good or Best first, so pick an order and keep it the same on every quote.
If you'd rather not build this by hand, Itsquoted turns a voice memo from the walkthrough into a quote with Good, Better and Best options, priced from what you said or your price book. The client picks an option on their phone, ticks add-ons with the total updating live, and e-signs.
Recurring options: the job alone, or the job plus a plan
Some of the strongest tier structures mix one-time work with a recurring service: an AC install alone or with a maintenance plan (see HVAC maintenance agreements), a deep clean followed by a per-visit price, a spring refresh plus monthly bed care, or IT onboarding plus a per-user monthly fee. Four rules keep these clear:
- Never blend one-time and recurring into one number. Write "$7,800 one-time, plus $25 a month", not "$8,100". The client needs to see what they owe now and what they'll pay each month.
- Say what's due at signing. Usually the deposit on the one-time work, plus the first month of the plan if you bill in advance.
- Use first-year value for your own tracking. One-time + 12 x monthly (+ any yearly fee): $7,800 + 12 x $25 = $8,100. It's the fair way to compare a tier with a plan against one without, in your reports, not on the quote.
- Spell out the term: how long the plan runs, how it renews, how to cancel and whether the price can change at renewal.
Itsquoted lets each line be one-time, monthly or yearly on the same quote: the client sees the one-time total plus the monthly price, and the deposit is taken on what's due at the start. That "per month" is the price of a service. A per-month figure for a loan is a different thing.
Should you show monthly payments on each tier?
It's tempting to put "or $189 a month" under each tier. Don't, unless you're ready to add full credit disclosures.
Under Regulation Z, which implements the federal Truth in Lending Act, an ad for consumer credit that states the amount of any payment, the number of payments or repayment period, a down payment, or a finance charge must also state the down payment, the repayment terms over the full term of the loan, and the annual percentage rate, using that term (12 CFR 1026.24(d); also on Cornell's LII). Any rate must be stated as an APR (1026.24(c)), and you may advertise only terms actually available (1026.24(a)).
This isn't only a lender's rule. The CFPB's official interpretation says everyone who advertises consumer credit must comply, and names merchants and home builders as examples. It also says cost estimates for individual consumers and communications negotiating a specific deal aren't advertisements, while website ads, flyers, signs and organized solicitation letters are. So a monthly figure on your pricing page, a mailer or a social post is the clearest risk, and a tiered template you send to everyone may be hard to call a one-off estimate.
The safe pattern:
- Show each tier's price.
- If you offer financing, say "Financing available" and link to the lender's own page, where the lender gives its disclosures.
- Skip "as low as" figures, "0% for 12 months" and payment estimates unless the full disclosures are there.
- Recurring service prices are fine. A $25 a month maintenance plan is the price of a service delivered each month, not a loan payment.
This reflects the federal rule as of November 2026. It's general information, not legal advice, and rules change: check current federal and state law or ask a lawyer before you advertise financing.
Measuring which tier clients pick and your close rate
Every tiered quote is a small test. Track these each month or quarter:
- Close rate: quotes signed / quotes sent, counting each quote in the month it was sent.
- Tier mix: of the signed quotes, the share that chose each tier.
- Add-on rate: the share of signed quotes with each add-on.
- Average signed value and gross profit per job.
- Days to sign, and the reason for every loss you can find out.
A spreadsheet with one row per quote is enough:
Date sent | Client | Job type | Good price | Better price | Best price | Tier you recommended | Outcome (signed, declined, no answer) | Tier picked | Add-ons | Signed total | Gross profit | Days to sign | Reason lost
Worked example. Say you sent 40 tiered painting quotes last quarter and 18 were signed: a 45% close rate (18 / 40). Five chose Good, ten Better and three Best, so your tier mix is 28%, 56% and 17% (5, 10 and 3 out of 18, rounded). With the prices above, signed revenue is 5 x $2,400 + 10 x $3,900 + 3 x $5,600 = $67,800, and gross profit is 5 x $1,080 + 10 x $1,748 + 3 x $2,504 = $30,392, or $1,688 a job.
Mind the sample size. With 40 quotes, each signed job moves your close rate by 2.5 points (1 / 40), so 42% vs 47% can be two jobs. Compare the same season year over year when you can.
How to read what you see:
- Most clients pick Good. The step to Better may be too big or badly explained, or Better isn't built around what clients care about.
- Best almost never sells. Fine if it's a real option; it still sets the top of the range. If you'd dread doing it at that price, rework it.
- Best sells a lot (say, more than a third of signed quotes). It may be underpriced, or there's room for a higher option.
- Close rate drops after you add tiers. Check that Good isn't missing something clients expected and that the quote reads clearly on a phone.
Change one thing at a time so you know what moved the numbers. And tiers don't replace follow-up: see how to follow up on a quote.
Common mistakes with Good, Better, Best pricing
- A Good tier that isn't a real job. If Good leaves out the permit, the prep or the part that makes the work last, the client finds out later, and your other tiers lose credibility with it.
- One price, marked up twice. It can make the upgrade your least profitable job.
- Padding Best with items nobody needs to make Better look cheap. Clients notice.
- Tiers that differ in ten small ways. If a client needs a spreadsheet to compare them, they'll put off the decision.
- Hidden scope differences. If Good leaves out haul-away and Better includes it, say so, and keep a "Not included" section on every quote.
- No recommendation. Three options with no guidance hand the client the hardest part.
- Not tracking. Without your own tier mix and close rate, you're guessing.
FAQ
Does Good, Better, Best pricing increase sales?
It can, but no one can promise a number for your business. Lab research shows middle options gain share when buyers are unsure, and ACCA's survey of more than 1,000 HVACR contractors linked four or more options to higher close rates, though that's a correlation. Compare your close rate and average job value for a quarter before and after you switch.
Which tier do most customers pick?
There's no reliable public benchmark across trades. The compromise effect predicts the middle option gains share when people are unsure, and in lab studies a balanced option is chosen most. Your own tier mix after 30 or 40 quotes is the number to trust.
How do you price each tier?
Cost each tier from its own scope (labor at your loaded rate, materials, subs, permits), then divide by one minus your target margin: for a 45% margin, price = cost / 0.55. Then check gross profit per labor hour and the gaps between tiers. Don't mark up one price by fixed percentages.
How many options should a quote have?
Three tiers plus a few add-ons that fit the job is the usual format. ACCA's contractor survey linked four or more options, such as efficiency levels, indoor air quality add-ons and warranty packages, to higher close rates. More options don't reliably overwhelm buyers, but each one should fit this job.
What's the difference between tiers and add-ons?
Tiers are versions of the core job, and the client picks one. Add-ons are extras the client can add to any tier. If an item changes how well the main job is done, it's a tier difference; if it stands on its own, it's an add-on.
What is an example of Good, Better, Best pricing?
An interior paint job: walls only, two coats, for $2,400; plus trim, doors, caulking and a scrubbable paint for $3,900; plus ceilings, closets, drywall repair and a touch-up visit for $5,600. Those are example prices built from stated costs at a 45% gross margin.
Is Good, Better, Best pricing the same as price anchoring?
They're related. Price anchoring is the broader effect where the first number someone sees shapes how they judge the next. In a three-tier quote, Best sets the top of the range and Good the floor, which makes Better the comfortable middle.
Can I show a monthly payment under each tier?
Not in an ad without full Regulation Z disclosures: stating a payment amount triggers disclosure of the down payment, the repayment terms and the APR. The safe pattern is each tier's price plus "Financing available" with a link to the lender. Recurring service prices, like a monthly maintenance plan, are fine.
About the author
Doron Sol has been a software developer for 25 years and is an AI specialist. He founded Itsquoted, which turns a voice memo into a quote clients can sign on their phone.