How to Write a Contractor Estimate Clients Sign: What to Include, by State

By . Updated November 24, 2026. 21 min read.

Short answer

A contractor estimate should show your business name, license number and insurance, the client and job address, a line-by-line scope with quantities and named materials, what's not included, options, tax, the total, payment terms and deposit, start and finish dates, and an expiry date. In states like California, a signed estimate is a home improvement contract and needs the state's notices too.

On this page
  1. What to include in a contractor estimate
  2. Measure and scope at the walkthrough
  3. How to price the lines: labor, materials and markup
  4. Write the scope and a "Not included" section
  5. Options, add-ons, line prices and sales tax
  6. How long should a quote be valid?
  7. Legal requirements by state: license numbers and contract contents
  8. Payment terms and the deposit
  9. Send the estimate the same day
  10. A sample contractor estimate, worked line by line
  11. FAQ

A contractor estimate gets signed when the client can read it on a phone in two minutes, see exactly what they're paying for, and say yes without calling to ask what a line means. A logo, five lines and a total won't do that, and in many states it isn't even legal once signed. This guide covers what to include, how to scope and price the lines, the "Not included" section, options, line prices and sales tax, expiry dates, the license numbers and contract terms states like California, New York and Massachusetts require, deposit limits, sending it the same day, and a complete sample estimate worked line by line.

What to include in a contractor estimate

An estimate sells the work, and once the client signs it, it usually becomes the agreement you're both held to. Write it to that standard from the start. In California, any home improvement contract over $500 has to meet a long list of requirements in Business and Professions Code section 7159, and the statute counts an agreement "whether oral or written, or contained in one or more documents." Your signed estimate for a $6,000 fence is part of a regulated contract, whatever you call it at the top of the page. (For what the labels mean and when a price binds you, see estimate vs quote vs bid vs proposal.)

Here's what a complete estimate contains:

Part What to write Why it matters
Your business Legal name, address, phone, email, license number, insurance carrier Several states require the number (table below)
Client and job site Name, phone, email, job address The job address can differ from the billing address
Estimate number and dates "Estimate 1043, issued November 24, valid until December 8" Tracks versions and ends the price
Scope summary One or two plain sentences about the finished result The part the client reads first
Line items Description, quantity, unit, unit price, line total Shows what drives the price
Materials Brand, model, grade, size, color New York and New Jersey require material descriptions
Not included Work you won't do or will price separately Disputes start with what nobody wrote down
Options and add-ons Good, Better and Best packages, optional lines The client says yes at a price they choose
Totals Subtotal, discount, tax, total; one-time and monthly apart No surprises at the final invoice
Payment terms Deposit, progress payments tied to milestones, final payment Deposit caps apply in several states
Schedule Approximate start and completion dates Required in most of the states below
Changes How change orders work California requires a change order note
Warranty What you guarantee and for how long New Jersey requires any warranty to be stated
State notices Cancellation, lien and recovery fund notices Depends on the state and the price
Signature Printed name, signature, date, options chosen Proof of what was agreed

A copyable estimate template

Paste this into your word processor or quoting tool and fill in the brackets:

[Business legal name] | [Address] | [Phone] | [Email] License no. [number] | Insured by [carrier], general liability

Estimate [number] | Issued [date] | Valid until [date] Prepared for: [Client name], [phone], [email] Job address: [address]

What we'll do: [One or two sentences describing the finished result.]

Line items: [Description, with brand, model and grade] | [Quantity and unit] | [Unit price] | [Line total]

Options: [Package or add-on] | [Price] | [ ] Yes

Not included: [List]

Subtotal: $[ ] | Sales tax: $[ ] or "not charged on this contract" | Total: $[ ]

Payment: Deposit $[ ] at signing. $[ ] when [milestone]. Balance of $[ ] at completion.

Schedule: Approximate start [date]. Approximate completion [date].

Changes: Any change to the work or price goes on a change order we both sign before the changed work starts.

Warranty: [Terms]

[State-required notices]

Accepted by: ______________ Date: ______________

Measure and scope at the walkthrough

How to make an estimate that holds up starts in the driveway, not at the desk. Every number on the page should trace back to something you measured, counted or saw.

Measure in the units you price by. If you price fence by the linear foot, walk the run with a wheel. If you price paint by the square foot of wall, measure the rooms and count the doors and windows. Write the numbers down where you stand.

Photograph everything you're pricing, plus anything that could bite you later: the rotted corner post, the sprinkler head, the slope, the side gate your wheelbarrow won't fit through.

Ask the questions that change the price:

  • What result do you want, and by when?
  • Who else needs to approve this: a spouse, a landlord, an HOA?
  • Do you have a budget range in mind? (It tells you which options to lead with.)
  • Anything I should know about access, pets, parking or working hours?

Note what you can't see: rot under decking, wiring behind a wall, buried utilities. Before any digging, contact 811: the Common Ground Alliance's 811 service is free, asks diggers to contact it a few business days ahead, and lists fence installation among the jobs that should.

Capture your notes right away, before the details fade. If typing it up is the step that slips, Itsquoted turns a one or two minute voice memo recorded after the walkthrough into a draft estimate with line items, priced from what you said or from your team's price book and never invented, which you review and edit before it goes out.

How to price the lines: labor, materials and markup

Each trade prices differently (see how to bid a painting job or how much to charge for house cleaning), but every line is built from the same three pieces.

Labor: hours times your loaded cost, meaning what an hour of work actually costs you, not the wage. In the Bureau of Labor Statistics' Employer Costs for Employee Compensation for June 2026, private-industry employers paid an average of $32.82 an hour in wages and $14.07 in benefits, so benefits were 30.0% of compensation, or $14.07 / $32.82 = 43% on top of wages. Work out your own from payroll taxes, workers' comp, insurance and paid time off. Say yours comes to 40% on a $27 wage: $27 x 1.40 = $37.80, call it $38 an hour.

Materials: the supplier's price plus waste. Get a written quote from your supplier for the actual list, add a waste allowance from your own job history (the sample below uses 5%), and include delivery and disposal fees.

Markup: what covers overhead and profit. Your truck, insurance, office, software, the unpaid hours spent estimating, and profit come out of it. Don't confuse markup with margin:

Markup on cost Price on $1,000 of cost Gross margin
25% $1,250 20.0%
50% $1,500 33.3%
67% $1,670 40.1%
100% $2,000 50.0%

Margin = markup / (1 + markup). If you need a 33% margin to cover overhead and profit, a 33% markup leaves you short: it only gets you 25%.

Turn the result into unit prices. Clients understand "$46 a linear foot" better than a cost breakdown, and a shared price book lets your whole team quote the same job the same way.

Write the scope and a "Not included" section

The scope is the part of the estimate a judge, an inspector or an annoyed client will read word by word. Write it as the finished result, the method and the materials:

Remove the existing 120 ft wood fence along the back property line and haul it away. Set 16 pressure-treated 4x4 posts in concrete, 8 ft apart. Build a 6 ft tall privacy fence with three cedar 2x4 rails per section and 5.5 in cedar pickets, installed side by side with no gaps.

Name the materials. New York's General Business Law section 771 requires the materials to be described, including make, model number or other identifying information, and New Jersey's rule N.J.A.C. 13:45A-16.2 asks for the make, size, model and grade of fixtures and materials where they apply. Even where it isn't required, "cedar pickets" prevents a fight that "wood fence" starts.

Use allowances for choices the client hasn't made. "Tile allowance: $4.50 a square foot, 180 square feet, $810. Tile above the allowance is added on a change order." You don't eat the upgrade.

Write a hidden-conditions line. "This estimate covers what we could see during the walkthrough. If we find rot, damaged framing or other hidden conditions, we'll stop, show you, and price the extra work on a written change order before we do it."

Then write what you're not doing. The "Not included" section is the cheapest insurance you'll ever buy. Pick what fits the job:

Not included:

  • Permits or fees, if your city requires them (we'll tell you before we start)
  • Locating or marking the property line; we build on the line you show us
  • Moving or repairing sprinkler lines, irrigation or buried cables in a post location
  • Removing trees, roots or plants along the fence line
  • Painting or staining (offered as an option above)
  • Patching, painting or texture outside the work area
  • Work on the neighbor's side of the fence

Other trades have their own list (a cleaner's might say "inside the oven and fridge unless listed"). The rule is the same: every predictable "I thought that was included" goes in writing before the client signs.

Options, add-ons, line prices and sales tax

Offer options instead of one take-it-or-leave-it price

One price gives the client one decision: yes or no. Two or three packages change the question to "which one?" Build a Good package that does the job, a Better one most people should buy and a Best one with the upgrades, plus optional lines the client can tick, like staining or a second gate. See Good, Better, Best pricing for how to price the tiers.

On paper, options leave the client adding up their own total. Itsquoted does that part: the client opens one link on their phone, picks Good, Better or Best, ticks add-ons, watches the total update, then signs and pays your deposit through your own payment link.

Show or hide line prices

Showing a price on every line builds trust and lets the client cut a line instead of walking away. Showing only package totals keeps the conversation on the result, not on your "install labor" line against a big-box sticker. Both work. Two cautions:

  • Show quantities and what's included even when you hide prices.
  • Hiding line prices never removes what your state requires, like California's contract price and payment schedule in dollars and cents, or New Jersey's hourly rate on time-and-materials work.

Keep recurring lines apart from one-time lines

An install plus a maintenance plan is two kinds of money. Show "$1,850 one-time, plus $39 a month," not one blended number, and take the deposit on what's due at the start. (For service plans, see HVAC maintenance agreements.)

Get sales tax right for your state

Sales tax on construction varies widely, so check with your state's revenue department. Two states show the range:

  • California: under the Department of Tax and Fee Administration's Publication 9, contractors are "always the consumers of materials" they furnish and install on a lump-sum contract. Tax applies to your materials cost: you pay it when you buy, build it into your price, and the client's total has no tax line. On a time-and-materials-plus-tax contract, you're the retailer of the materials instead.
  • Washington: for custom construction, the Department of Revenue says the contractor must collect sales tax from the landowner on the gross contract price, and that your bid should reflect any possible sales or use tax.

When you do collect tax, put it on its own line, labeled with the rate. When you don't, say so: "California sales tax is included in our materials cost; no sales tax is charged on this contract."

How long should a quote be valid?

Long enough for the client to decide, and no longer than your suppliers hold their prices. If your lumber yard holds its quote for 14 days and your estimate says 30, you're carrying the price risk for the other 16.

Ask each supplier how long their quote holds, set your expiry on or before the shortest hold for any major material, and for work scheduled months out, add a materials clause instead of guessing.

For most residential work, 14 to 30 days is a workable window. There's no legal standard number for private work, and an offer with no stated time generally lapses after a "reasonable" time that someone else decides later. The estimate vs quote guide explains how offers lapse.

Copyable wording:

This estimate is valid until [date]. Material prices are based on our supplier's quote of [date]. If the work is scheduled more than [30] days after you sign, we'll update the price of [material] to our supplier's price at the time of order and show you the change before we order.

Many states regulate home improvement contracts in detail, and some require your license number on the estimate itself. Here are eight, as of November 2026. This is general information, not legal advice. Rules change and have exceptions, so check your state's current law or ask a lawyer before you rely on any template.

State and law License or registration number Written contract: when, and key contents Deposit rule Right to cancel
California, B&P 7030.5, 7159, 7159.5 On contracts, bids and all advertising, which includes contract proposals Over $500: price, project and significant materials, approximate start and completion dates, payment schedule, change order note, insurance and lien notices, set headings Lesser of $1,000 or 10% of the price 3 business days; 5 days if the owner is 65 or older; 7 for repairs after a declared disaster
Florida, 489.119, 489.126, 489.1425 Number in each offer of services, business proposal, bid, contract or advertisement Residential contracts over $2,500 must include the Homeowners' Construction Recovery Fund notice Over 10% on residential work: apply for permits within 30 days and start within 90 days of the permit, unless just cause or agreed in writing Not in these sections
Massachusetts, c. 142A, s. 2 Registration number in the contract Over $1,000: start and substantial completion dates, detailed work and materials, total price, payment schedule, signatures, and "Do not sign this contract if there are any blank spaces" in 10-point bold Greater of one-third of the price or the cost of special-order materials Notice of the owner's 3-day cancellation rights
New York, GBL 770, 771 License number, if you have one Over $500: signed writing with approximate start and substantial completion dates, work and materials with make and model, price, bold mechanic's lien notice, insurance disclosure Payments before completion must be deposited as Lien Law 71-a(4) requires, or bonded; progress payments in dollars and cents Until midnight of the third business day, with a narrow emergency exception
New Jersey, N.J.A.C. 13:45A-16.2, 17.11 Registration number on ads, business documents, contracts and correspondence Over $500: legal name and address of seller and salesperson, work and principal materials, total price (hourly rate on time and materials), start and completion dates, warranties No percentage cap in these rules Not in these rules
Pennsylvania, Act 132 of 2008 Registration number in all ads and on all contracts, estimates and proposals (section 6) Over $500: 13 items, including approximate start and completion dates, description and specifications, total price, deposit and special-order costs as separate lines, subcontractors, insurance Contracts over $5,000: one-third, or one-third plus special-order materials named in the contract 3 business days after signing
Maryland, Bus. Reg. 8-501, 8-617 Your license number and each salesperson's in the contract Approximate start and substantial completion dates, work and materials, agreed price, the Commission's licensing notice, signed copy before work No more than one-third at or before signing, and nothing before the contract is signed 3 business days when payment is secured by an interest in the home
Arizona, A.R.S. 32-1158 License number in the contract Over $1,000: job address, date, estimated completion date, description, total price including all taxes, deposit and progress payments, Registrar of Contractors complaint notice in 10-point bold Deposit amount must be stated Not in this section

A few details behind the table:

  • California's license number rule reaches your estimate. Section 7030.5 requires the number in "all forms of advertising," and the board's rule (16 CCR 861, in the CSLB's 2025 law book) defines advertising to include "any card, contract proposal, sign," vehicle lettering and electronic ads. The civil penalty runs $100 to $1,000 (16 CCR 884).
  • California's contract has a set order. Section 7159 lists the headings ("Contract Price," "Downpayment," "Schedule of Progress Payments" and more) and requires certain notices in 12-point bold, and the CSLB publishes a sample home improvement contract laid out that way. A practical setup: keep the estimate as the detailed scope and price, and list it in the contract under "List of Documents to be Incorporated into the Contract." Small service calls of $750 or less, where the client called you, you sell only what fixes the problem and payment waits until the work is done, can use the simpler service and repair contract in section 7159.10.
  • Outside these state rules, a federal one may apply. The FTC's Cooling-Off Rule gives buyers until the end of the third business day to cancel many sales of $25 or more made at their home, with some exceptions, such as certain emergencies. See e-signatures for contractors for how cancellation notices work when the client signs on a phone.

If your state isn't listed, start with its contractor licensing board and its attorney general's consumer protection pages.

Payment terms and the deposit

Write payment terms as amounts and events, not percentages and vague stages. From the sample estimate below:

Deposit: $665.40 at signing. Second payment: $2,500.00 when all materials are delivered and the old fence is removed. Final payment: $3,488.60 when the fence is complete and we've walked it with you. We accept [methods].

Watch the deposit caps in the table above: California's is the strictest of the eight, at $1,000 or 10% of the price, whichever is less, and Florida attaches permit and start deadlines to any deposit over 10%. Our guide to contractor deposit laws by state covers more states and the exceptions.

Tie progress payments to work done. California's section 7159.5 says that, except for the downpayment, you may neither request nor accept a payment that "exceeds the value of the work performed or material delivered." New York requires each progress payment in dollars and cents, tied to a stage of work, with a "reasonable relationship" to the work done.

Send the estimate the same day

The best time to send an estimate is the evening of the walkthrough:

  • You remember the job: the measurements, the client's words, what they cared about most. By Thursday it's a guess.
  • The client is still deciding. The first complete, clear estimate they get often becomes the one they compare the others to.
  • Speed reads as reliability. A client who waited a week for a price expects to wait a week when something goes wrong.

The rule: every estimate goes out by the end of the walkthrough's business day. If you need a supplier price first, send a note that day saying when the estimate will arrive, and hit that date.

Keep the message short, and send a link the client can open on a phone rather than an attachment they have to download:

Hi Dana, thanks for walking the yard with me today. Here's your estimate for the new fence: [link]. I've included cedar and pine options, plus staining if you want it. The prices hold until December 8. Any questions, call or text me at [number].

Then follow up on a schedule, not when you remember. See how to follow up on a quote for timing and scripts.

A sample contractor estimate, worked line by line

Say you run a two-person fence company in Sacramento, California. A homeowner wants 120 feet of leaning wood fence along the back of the yard replaced with a 6-foot privacy fence, plus a new 4-foot walk gate on the side yard. Fences count as home improvement under section 7151, so the California rules apply. Your assumptions for this example (yours will differ):

  • Loaded labor cost: $38 per person-hour.
  • Markup: 50% on cost (cost x 1.5), a 33% gross margin.
  • Supplier prices include sales tax, since you pay it on materials for a lump-sum job.
  • The lumber yard holds its quote for 14 days.

Step 1: remove and haul away the old fence

  1. Labor: 2 people x 4 hours = 8 hours x $38 = $304.00.
  2. Dump fee: $90.00.
  3. Cost: $304.00 + $90.00 = $394.00.
  4. Price: $394.00 x 1.5 = $591.00.

Step 2: the cedar fence (the Better package)

120 feet at 8 feet per section is 15 sections, which takes 16 posts.

Material Quantity Unit cost Cost
Pressure-treated 4x4x8 posts 16 $17.50 $280.00
Cedar 2x4x8 rails (3 per section) 45 $11.00 $495.00
Cedar pickets, 5.5 in x 6 ft (18 per section) 270 $4.50 $1,215.00
Concrete, 50 lb bags (2 per post) 32 $6.50 $208.00
Screws, brackets, hardware 1 lot $140.00 $140.00
Materials subtotal $2,338.00
Waste and culls, 5% $116.90
Materials total $2,454.90
  1. Labor: 2 people x 2 days x 8 hours = 32 hours x $38 = $1,216.00.
  2. Cost: $2,454.90 + $1,216.00 = $3,670.90.
  3. Price: $3,670.90 x 1.5 = $5,506.35.
  4. Per foot: $5,506.35 / 120 = $45.89. Round up to $46.00 a foot.
  5. Line total: 120 x $46.00 = $5,520.00.

Step 3: the gate

  1. Materials (two 4x6 gate posts, frame, pickets, hinges, latch): $210.00.
  2. Labor: 4 hours x $38 = $152.00.
  3. Cost: $362.00. Price: $362.00 x 1.5 = $543.00.

Step 4: the Good package and the add-on

The Good package swaps cedar for pressure-treated pine: 45 rails at $7.00 = $315.00 and 270 pickets at $2.75 = $742.50. Materials: $280.00 + $315.00 + $742.50 + $208.00 + $140.00 = $1,685.50, plus 5% waste ($84.28) = $1,769.78. With the same $1,216.00 of labor, cost is $2,985.78, times 1.5 = $4,478.67, or $37.32 a foot, rounded to $37.50: $4,500.00. A pine gate ($150.00 materials + $152.00 labor = $302.00, times 1.5) is $453.00.

The add-on is staining and sealing both sides once the wood dries: 120 ft x 6 ft x 2 sides = 1,440 square feet. At an assumed 200 square feet a gallon, that's 7.2, so 8 gallons at $45 = $360.00, plus 12 hours x $38 = $456.00 of labor: $816.00 cost, times 1.5 = $1,224.00.

Step 5: what the client sees

Good: pine Better: cedar
Remove and haul away old fence, 120 ft $591.00 $591.00
6 ft privacy fence, 120 ft $4,500.00 (at $37.50/ft) $5,520.00 (at $46.00/ft)
4 ft walk gate with hinges and latch $453.00 $543.00
Total $5,544.00 $6,654.00
Optional: stain and seal both sides + $1,224.00 + $1,224.00

The client picks cedar without the stain: $6,654.00.

Step 6: check the margin

  1. Total cost: $394.00 + $3,670.90 + $362.00 = $4,426.90.
  2. Gross profit: $6,654.00 - $4,426.90 = $2,227.10.
  3. Margin: $2,227.10 / $6,654.00 = 33.5%. Rounding up the foot price added a little.

Step 7: tax, deposit and payment schedule

Tax: this is a lump-sum contract, so under CDTFA Publication 9 you're the consumer of the materials. The tax is already in your materials cost, and the estimate says "No sales tax is charged on this contract."

Deposit: 10% of $6,654.00 = $665.40, which is less than $1,000, so the most you can take at signing is $665.40.

Progress payments:

When Amount
At signing (downpayment) $665.40
All materials delivered and old fence removed $2,500.00
Fence and gate complete, walked with the client $3,488.60
Total $6,654.00

Check the second payment against section 7159.5: by then you'll have collected $665.40 + $2,500.00 = $3,165.40. The finished removal ($591.00) plus the delivered materials at your own cost ($2,454.90 + $210.00 = $2,664.90) come to $3,255.90, more than you've collected. The schedule passes.

Step 8: dates, exclusions and notices

  • Expiry: issued November 24, valid until December 8, the end of the lumber yard's 14-day hold.
  • Schedule: approximate start December 14, approximate completion December 16.
  • Not included: the scope section's list, plus the sprinkler line at the northeast corner if a post lands on it.
  • California items: license number at the top, the section 7159 headings and notices, the right to cancel (three business days, or five days if the owner is 65 or older), and the estimate listed as an incorporated document.

FAQ

What should a contractor estimate include?

Your business name, address and license number, the client and job address, line items with quantities and unit prices, named materials, a "Not included" list, options, tax and total, payment terms and deposit, start and completion dates, a change order clause, an expiry date and a signature line. Many states add required notices once a signed estimate becomes a home improvement contract.

How long is an estimate good for?

As long as the estimate says. Without a stated date, an offer generally lapses after a "reasonable" time, which is vague. For most residential work, 14 to 30 days works, ending on or before your suppliers' price holds run out.

Should estimates be free?

For most residential jobs, yes: the walkthrough is part of your sales cost. Charging makes sense for design-heavy work, diagnostics or jobs that take hours to measure and spec. One middle ground: charge a fee and credit it toward the job if the client signs.

Is an estimate legally binding?

Not because of its name. An estimate becomes binding when it's a definite offer and the client accepts it, usually by signing. See estimate vs quote vs bid vs proposal for how offer and acceptance work.

How do you write a quote for a job?

Measure and photograph the job, price each line from labor hours, materials and markup, then write the scope, exclusions, options, payment terms, dates and an expiry date. Add your license number and any notices your state requires, and send it the same day.

Can a contractor charge more than the estimate?

On a fixed price, only for changes the client agrees to, on a written change order. California makes a change order unenforceable against the buyer unless it's in writing before the changed work starts, and Pennsylvania lets time-and-materials work run no more than 10% over the written estimate without a signed change order. For hidden conditions: stop, show the client, and get a signature.

Do I need my license number on an estimate?

In some states, yes. California requires it on contracts, bids and all advertising, which its rules define to include contract proposals; Florida on every business proposal and bid; Pennsylvania on all contracts, estimates and proposals. Even where it isn't required, careful clients look for it.

Is there a free contractor estimate template?

Yes, the template in this guide is free to copy. Fill in your business details, line items, exclusions, payment terms and dates, then add the notices your state requires before the client signs.

About the author

has been a software developer for 25 years and is an AI specialist. He founded Itsquoted, which turns a voice memo into a quote clients can sign on their phone.

Send your next quote before you leave the job

Record a voice memo, review the quote, and send it. Your client picks an option, signs and pays the deposit on their phone. 14 days free.